Bid to run new trains on West Coast Mainline refused

Bid to run new trains on West Coast Mainline refused

Avanti West Coast high-speed passenger train travelling along electrified railway tracks, viewed from a low angle, with overhead power lines and a blurred countryside background suggesting speed.Image source, Avanti West Coast
Image caption,

The West Coast Main Line is already under significant pressure, Stephanie Tobyn, from the Office of Rail and Road said

  • Published
    1 hour ago

Plans for new train services between London and Wrexham, Rochdale and Blackpool have been rejected by the Office of Rail and Road (ORR).

The proposal to add more trains on the West Coast Main Line would "likely increase delays and cancelled trains for passengers", the regulator said.

It rejected Wrexham, Shropshire and Midlands Railway's application for four daily Wrexham to London Euston return services, as well as Lumo's proposal for up to four return services between Rochdale and Euston on weekdays and Saturdays, and three on Sundays.

Avanti West Coast's plans for additional services between Blackpool and Euston were also denied by the ORR.

The regulator said: "Gaps in the current timetable need to provide important space for trains to recover when disruption occurs, minimising delays to passengers.

"ORR concluded that adding more services into these windows in the timetable for recovery would reduce that resilience, increasing the risk of disruption spreading to other services and affecting more passengers."

'Heavily used'

Stephanie Tobyn, from the ORR, said: "New services, destinations and greater choice can bring real benefits for passengers and communities.

"But the West Coast Main Line is already under significant pressure, with performance reflecting limited resilience on a heavily used part of the rail network.

"Our detailed analysis has shown that adding more trains to the current timetable would reduce the ability to recover when disruption occurs, increasing the risk of delays spreading and making reliability of the network worse for all passengers."

The ORR said its assessment and decision came after similar applications were rejected in 2025.

Get in touch

Tell us which stories we should cover in Lancashire

Listen to the best of BBC Radio Lancashire on Sounds and follow BBC Lancashire on Facebook, external, X, external and Instagram, external. You can also send story ideas via Whatsapp to 0808 100 2230.

Related topics

Read original article

Leave a Reply